Ball roller mill operate routine
1. Before the ball roller mills start, check whether erery part of ball mills normal, whether the connecting bolts loose, whether the lubrication of lubrication points is normal, whether the driving device is reliable, whether protective equipment is intact, whether connection of motor carbon is fine.
2. Check whether there is barrier surrounding the ball roller mills. Forbit persons standing near ball roller mills when it is starting.
3. Press start button to start the motor and notice the change of electric current. The ball mills' continuous starting don't surpass two times and the first starting and the second starting should separate for more than 5 minutes.If it must be thirdly started, ball roller mill should be check by electrician and fitter before it is started.
4. The ball mill don't start with other equipment at the same time avoiding the high current.
5. Feed water, feed ore and add steel ball to the ball roller mill must follow the operate routine. Overload and preoperation are both bad for the ball mill.
6. When the ball roller mill is running, it should be checked whether the barrel body leak, whether the feeding water or ore is normal, whether the electric current and voltage is normal.If there is some proble, it should be handled quickly.
7. When the ball mill is running, it should be checked whether the bearing or the oil ring is lubricated and whether the temperature of bearing is normal.